Completed in 12 weeks, featuring a 2-bedroom, 1-bath design, with a durable slate roof, elegant timber cladding, structured retaining walls, and a beautifully designed patio area that also incorporates a new bay window on the main house.
A 10-week construction project involving the removal of a corner section of the house, underpinning and installing steelwork in preparation for the extension, pouring a new slab along with a new boundary cavity wall, and fitting a glazed roof and bi-fold doors. The project also includes a new boiler, complete electrical installation, flooring, decoration, and kitchen renovation, all of which were approved by the building control officer (BCO).